Drainage flooding at Tinkune road
8:54 AMThe reconstruction of the Rani Pokhari – located at the heart of the
capital city – will resume this week following an agreement between the
Department of Archaeology (DoA) and Kathmandu Metropolitan City (KMC).
The Department had instructed KMC on September 1 to halt the ongoing
reconstruction after finding out that the reconstruction was taking
place against the set criteria.
As per the agreement to correct the structures that have already been
built with the rest of the construction to take place in adherence to
the instruction of the Archaeology Department, the reconstruction will
start from this week, DoA Spokesperson, Ram Bahadur Kunwar said.
Department has instructed the KMC to rebuid the historic Bal Gopaleshwor
temple at the centre of the pond in its old stature. The DoA intervened
as the reconstruction was taking place with use of cement, gravel, sand
and rods.
![]()
0 comments